Fabrication, Supply, Transportation, Construction and Erection of Ipamalta Suspended Trail Bridge, Lalitpur/Makwanpur over Bagmati river, span 296.9m through construction Turnkey package.
Suspension Bridge Division (SBD) - Tender/Invitation for Bid
Fabrication, Supply, Transportation, Construction and Erection of Ipamalta Suspended Trail Bridge, Lalitpur/Makwanpur over Bagmati river, span 296.9m through construction Turnkey package.