Seti Nadi-3 Hydroelectric Project (SR-3 HEP) is a Peaking Run-of-River type project located in Jayaprithvi Municipality of Bajhang District, Sudurpaschim Province of Nepal. The project will use the flow from the Seti River for power generation, and the power will be fed into integrated power system of Nepal at the nearest grid substation proposed by Rastriya Prasaran Grid Company Limited (RPGCL) at Kailash substation, Bajhang. The available gross head and net head of the project is 124.73 m and 115.07 m respectively and the design discharge is 84.60 m3/sec at 35.20% exceedance of flow. The capacity of the project is estimated to be 87MW and will produce the energy of 474.37 GWh.