The Parsenipur Branch Canal is located at chainage 39+375 of the western main canal, with a command area of 1,398 hectares. The length of this branch canal is 9.25 km, and its construction has already been completed. The major works include construction of Canal lining, head regulator, cross regulator, Drop,Village Road Bridge, Foot Bridge, PUP, Syphone, escape protection etc. The command area of Persenipur Sub-secondary (S4SS3) with associated structure is 370 Ha. The proposed command area is 370 ha out of 1398 ha