Construction of Lot-2 : Electromechanical Works of Upper Modi Hydroelectric Project under Plant and Design-Build Contract. MJCL/UM/EM/ICB/082-83/PDB-1 (Package 2)
Modi Jalvidyut Company Limited - Tender/Invitation for Bid
Modi Jalvidyut Company Limited, a subsidiary of Nepal Electricity Authority, was established to develop the Upper Modi ‘A’ Hydroelectric Project (UMAHEP) with an installed capacity of 42 MWand the Upper Modi Hydroelectric Project (UMHEP) with an installed capacity of 18.2 MW. Both projects are located in the Annapurna Rural Municipality of Kaski District, about 250 kilometers westof Kathmandu, and are designed as a cascade development along the Modi River. This project has a gross head of 135.00 m, net head of 126.48 m, and an installed capacity of 18.2 MW, producing 109.217 GWh annually.